How can concrete crack repair be quick and easy?

With UZIN RR 203 and UZIN NC 182.

Cracks and concrete expansion joints must be closed prior to the installation of the new floor covering. While expansion joints have been deliberately made in the surface, cracks represent damages which may have different causes. In order to avoid the joints and cracks showing through the floor, they must be closed. Combining UZIN NC 182 rapid repair and UZIN RR 203 crack bridge is a proven system and suitable for both expansion joint and concrete crack repair.


Video

Step by step guide:

When joints and cracks are present in the concrete or screed UZIN NC 182 in conjunction with the crack bridge UZIN RR 203 offers a quick and easy solution.

Paul Frizzell
National Sales Manager and Technical Support

UZIN PE 360 PLUS Ready Mixed Primer

Moisture tolerant dispersion-based primer for absorbent substrates, screeds and concrete

  • ready mixed
  • sprayable
  • tolerant against alkaline moisture
  • rapid drying
  • reduces the absorbency of the substrate

UZIN RR 203 Crack Bridge

Fibreglass crack reinforcement fleece for repairing cracks, day joints and slight movement on different substrates

  • extremely high tensile strength
  • bridges and reinforces cracks, day joints and transitions
  • easy to apply
  • avoids the use of repair resins
  • very high strength

Installation systems for screeds, floors and wood flooring

Machinery and special tools for substrate preparation and installation of floor coverings

Complete product range for installation, renovation and maintenance of wood flooring

Resin and cementitious floor finishes combining performance and design

Installation systems for tiling and natural stone

High quality painting, plastering and drywalling tools