Kreikamp Projectinrichting has set up various cinemas for Pathé cinemas, including the cinema at the new Eemplein construction project in Amersfoort: a beautiful cinema with 8 screens and a total of 1,700 seats.
Data
Building type | Public building (International) |
---|
New construction for Pathé Cinemas Amersfoort
Pathé Cinemas had the design drawn up by Architect studio NAÇO (Paris) in collaboration with Dutch architect and designer Robert Helmink from Bu Roh (Vorden). For Pathé Cinemas, it was important for their house colours, red and purple, to be incorporated into the design. It was also essential for the materials selected to be suitable for the intensive use typical of a cinema.
Implementation
In terms of their layout, Pathé cinemas are characterised by the use of striking colours and shapes. For example, they work a lot with circles and surfaces in a different colour. To bring together various disciplines, materials and parties, it was decided use the co-ordination and implementation expertise of Kreikamp Projectinrichting which, thanks to its vast experience, is able to manage the hectic schedule of a job of this calibre.
In the various spaces, different types of floor covering and Arturo poured flooring and coatings were used. (Carpet: Dansk Wilton Colortec 1500 in various colours (own import) Vinyl corridors: Forbo Flooring Eternal, Forbo Flooring Sarlon, Armstrong Cenit Clean-up: Coral brush)
The next new Pathé cinema is already being planned by Kreikamp Projectinrichting! The renovation of Pathé Scheveningen is planned for summer 2013.